Jayco Plant 55: Twin Falls, ID

Twin Falls, ID ~
712.8 kW~
Behind the Meter rooftop solar array installed to achieve long term energy cost savings and hedge against utility rate inflation.
Commissioned: July 21, 2025
Behind the Meter rooftop solar array installed to achieve long term energy cost savings and hedge against utility rate inflation.
Commissioned: July 21, 2025